Scarborough Spa’s Cliff Lift
The Scarborough South Cliff Tramway Company Limited was created in 1873, with the business objective of constructing a cliff lift that would link the South Cliff Esplanade to the Scarborough Spa, which at this point was the most popular music venue outside of London. The Spa Buildings, at the foot of South Cliff were the inspiration for building the first seaside cliff lift in Great Britain.